JRCX BUILD

Amir Hosseini

Created on January 23, 2024

Start designing with a free template

Discover more than 1500 professional designs like these:

Transcript

workshop

JRCX Build & Demolition

  • Candidate Selection process
  • Stakeholder session
  • Pilot Course starts
  • VPGroundForce EUSR Shoring
  • Slide & Facilitator
  • ALP supporting 20 gangs / 10 Supervisors
  • Maintain skills with JRCX4,12,11 and 14 boxes
  • Look at smaller, less complex builds then progress through the box range
  • NBE Safety & Supervisor to attend initial live networks builds
  • RCOM Awareness
  • Accreditation Team
  • Audit Team - support to check quality
  • Operational Readiness
  • Method Statement
  • Build Plan
  • Products & Practices
  • Improvements under Review
  • Items listed for the job
  • WERA’s
  • COSHH
  • HAZ waste
  • LOLER
  • esiTest
  • Other tools
  • Control platform
  • Depot setup
  • Vehicles
  • Supervisor survey
  • Supervisor Inspections
  • Secured Storage
  • Logistics
  • AMS Check
  • NBE Policies

TRAINING

PATH TO COMPETENCE

METHOD STATEMENT & RAMS

TOOLS, EQUIPMENT

OPERATIONAL READINESS

Stores, Tools, equipment, materials

  • 121 items listed for the job (78 New)
  • WERA’s .. .29 in total (some completed, others drafted, remainder following done from Observed Course
  • COSHH – 9 items but ~5 have been done
  • HAZ waste – 2 items notified
  • LOLER – 3 items
  • esiTest – 4 items (ladder, clamp puller, lifting chains and frame lifting clamp
  • Other tools still under considerations are we all gain experience of the job

Training Course Structure/Content

  • Candidate Selection process
  • February 5, 6 and 7 –Component Build for Citrus to check course order, slides, ground level materials walk through
  • March 4th Stakeholder session (1-2 days to walk the site and run through the delivery plan)
  • March 14th – Pilot Course starts for up to 10 days
  • VPGroundForce EUSR Shoring + WAH/Ladder introduced at the start
  • Slide-set for classroom session
  • Facilitator notes for classroom and build site

WorkShop PowerPoint

Method Statements & RAMS

  • Operational Readiness (document)
  • Methods to be addressed as separate tasks for RAMS (Draft 13 folder)
  • Build Plan
  • Products & Practices
  • Improvements under Review

Operational Readiness

  • Control platform – drawings, notifications
  • Depot setup – lifting, storage spec etc..
  • Secured Storage – ~15 items key to safety and quality, and specific to this job (10ft containers)
  • Vehicles – securing bracket in High Tops
  • Supervisor survey and job plan
  • Supervisor Inspections at depot prior to job (~28 items)
  • Logistics – hired equipment, quarry mix delivery, possible grab,
  • AMS Check (new list)
  • NBE Policies – cases for site assistance

Network Pilots and Full Accreditation

Path To Competence

  • ALP still supporting 20 gangs / 10 Supervisors for 2024
  • Maintain skills with JRCX4,12,11 and 14 boxes under key ~10 NBE programmes = 120 jobs pa .. ~ every 2 months
  • Look at smaller, less complex builds then progress through the box range
  • Accreditation: NBE Safety & Supervisor to attend initial live networks builds
  • RCOM Awareness – observer visits on subsequent courses
  • Accreditation Team – support to check knowledge & skills
  • Audit Team - support to check quality … Cube Testing (External supplier)