Want to create interactive content? It’s easy in Genially!

Get started free

JRCX Build & Demolition

Amir Hosseini

Created on January 13, 2024

Start designing with a free template

Discover more than 1500 professional designs like these:

Transcript

Title here

Lorem ipsum dolor sit

Title here

Lorem ipsum dolor sit

Title here

Lorem ipsum dolor sit

Title here

Lorem ipsum dolor sit

Title here

Lorem ipsum dolor sit

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec blandit tortor orci. Ut imperdiet bibendum tortor, id porttitor leo. Proin ac enim semper, fermentum leo in, convallis risus.

20XX

20XX

20XX

20XX

20XX

Lorem ipsum dolor sit amet, consectetur adipiscing elit.

History Edu Colors

People

Lorem ipsum dolor sit

Lorem ipsum dolor sit

Lorem ipsum dolor sit

Excavation

Spoil Removal

Lorem ipsum dolor sit

Shoring

Lorem ipsum dolor sit

Lorem ipsum dolor sit

Operation Setup

Pre-brief

Survey

Platform

Material & Equipment

Lorem ipsum dolor sit

20XX

Work Area

20XX

JRCX Build & Demolition

  • The Logistic Supervisor is pivotal in verifying the team’s readiness for equipment.
  • They organise the timely availability of materials.
  • They handle the hiring of equipment.
  • All actions are based on the JRCX Store list.
Material & Equipment

The Logistic Supervisor plays a crucial role in ensuring the team’s preparedness for equipment usage. They are responsible for organising the timely availability of materials and hiring equipment as per the JRCX Store list which are the only approved list to use.

Chamber Inspection

Supervisor to complete a chamber inspection incase of demolition or the location in case of new chamber

Gang Selection

Based on the complexity of the task and the level of supervision required, the supervisor assigns the job to the appropriate team.

Traffic Management

Supervisor to complete a TM survey to request an adequate setup for a job.

ISIS Library

Control Stage

Allocation of the Job

This is the first stage that Control will get the Job and attach the relevant plans and CN drawings to be ready for the Engineers .

  • Prints of the area
  • CN drawings attachement based on the syntetics.

Pre-requisites

course

Experience and Training

  • 2 years in civils, including excavator experience and carriageway environment knowledge.
  • Trained digger, banks-person, slinger/signaller, and A58C mini digger lift qualified operative.
Work Process and Physical Demands
  • 4-day build process over 10-12 days involving various tasks.
  • Teamwork is essential for a safe and productive build.
  • Physical demands include working at height and ladder access.