Want to create interactive content? It’s easy in Genially!
JRCX Build & Demolition
Amir Hosseini
Created on January 13, 2024
Start designing with a free template
Discover more than 1500 professional designs like these:
Transcript
Title here
Lorem ipsum dolor sit
Title here
Lorem ipsum dolor sit
Title here
Lorem ipsum dolor sit
Title here
Lorem ipsum dolor sit
Title here
Lorem ipsum dolor sit
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec blandit tortor orci. Ut imperdiet bibendum tortor, id porttitor leo. Proin ac enim semper, fermentum leo in, convallis risus.
20XX
20XX
20XX
20XX
20XX
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
History Edu Colors
People
Lorem ipsum dolor sit
Lorem ipsum dolor sit
Lorem ipsum dolor sit
Excavation
Spoil Removal
Lorem ipsum dolor sit
Shoring
Lorem ipsum dolor sit
Lorem ipsum dolor sit
Operation Setup
Pre-brief
Survey
Platform
Material & Equipment
Lorem ipsum dolor sit
20XX
Work Area
20XX
JRCX Build & Demolition
- The Logistic Supervisor is pivotal in verifying the team’s readiness for equipment.
- They organise the timely availability of materials.
- They handle the hiring of equipment.
- All actions are based on the JRCX Store list.
Material & Equipment
The Logistic Supervisor plays a crucial role in ensuring the team’s preparedness for equipment usage. They are responsible for organising the timely availability of materials and hiring equipment as per the JRCX Store list which are the only approved list to use.
Chamber Inspection
Supervisor to complete a chamber inspection incase of demolition or the location in case of new chamber
Gang Selection
Based on the complexity of the task and the level of supervision required, the supervisor assigns the job to the appropriate team.
Traffic Management
Supervisor to complete a TM survey to request an adequate setup for a job.
ISIS Library
Control Stage
Allocation of the Job
This is the first stage that Control will get the Job and attach the relevant plans and CN drawings to be ready for the Engineers .
- Prints of the area
- CN drawings attachement based on the syntetics.
Pre-requisites
course
Experience and Training
- 2 years in civils, including excavator experience and carriageway environment knowledge.
- Trained digger, banks-person, slinger/signaller, and A58C mini digger lift qualified operative.
- 4-day build process over 10-12 days involving various tasks.
- Teamwork is essential for a safe and productive build.
- Physical demands include working at height and ladder access.