Select each touchpoint to complete the SI...
FINALISE SI
SI COMPLETE!
If you answered all questions correctly, you have automatically been entered into a draw and are in with the chance to win a £100 Amazon Voucher!The winner will be contacted by email.
FINISH
Trial Hole
You have dug a Trial Hole to expose the footings of the property. The depth of the underside of the footing is 650mm in this case.You have then hand augered to 3m to take 3 soil samples at varying depths and prepared these to be sent to the lab for testing.
Arborist Data Capture
You have captured the required tree works data using the Verifii App and Tree ID Technology, including tree species, size and basic measurements, location relative to structures, site and environmental conditions, photos, and key observational notes.
Drainage Survey
You have completed a CCTV Survey of the drains to confirm if there are any defects within the area of concern.
Water Mains Listening Test
You have turned off the Internal Stop Valve to isolate the water supply outside and undertake a Water Mains Listening Test to confirm whether there is a leak.
ILC
Lauren
Created on April 10, 2026
Start designing with a free template
Discover more than 1500 professional designs like these:
View
Practical Interactive Image
View
Akihabara Square Interactive Image
View
Akihabara Interactive Image
View
Essential Interactive Image
View
Interactive Team Image
View
Image with Audio
View
Image with interactive hotspots
Explore all templates
Transcript
Select each touchpoint to complete the SI...
FINALISE SI
SI COMPLETE!
If you answered all questions correctly, you have automatically been entered into a draw and are in with the chance to win a £100 Amazon Voucher!The winner will be contacted by email.
FINISH
Trial Hole
You have dug a Trial Hole to expose the footings of the property. The depth of the underside of the footing is 650mm in this case.You have then hand augered to 3m to take 3 soil samples at varying depths and prepared these to be sent to the lab for testing.
Arborist Data Capture
You have captured the required tree works data using the Verifii App and Tree ID Technology, including tree species, size and basic measurements, location relative to structures, site and environmental conditions, photos, and key observational notes.
Drainage Survey
You have completed a CCTV Survey of the drains to confirm if there are any defects within the area of concern.
Water Mains Listening Test
You have turned off the Internal Stop Valve to isolate the water supply outside and undertake a Water Mains Listening Test to confirm whether there is a leak.