Mission Campus 1st Floor
6641 Mission Rd.
Business Office
South Parking Lot
North Parking Lot
1st Floor
Education Wing
Office Suite
Mission Campus Main Floor
6641 Mission Rd.
Chancel
Friendship Hall
Bathroom
Main Floor
Mission Campus 3rd Floor
Education Wing
6641 Mission Rd.
Youth Loft
Office Suite
3rd Floor
Antioch Campus Main Floor
Nursery
14895 Antioch Rd.
FellowshipHall
Main Floor
Sanctuary
Preschool
Antioch Campus First Floor/Basement
14895 Antioch Rd.
Basement
Playground
Antioch Campus Roof
Roof
14895 Antioch Rd.
Food Pantry &Clothes Closet
Walk-in Cooler& Freezer
9960 Mission Rd.
Improve Parking Lots
$382,000
Both the north and south parking lots need repaving and improved lighting.
Replace Walk-In Refrigerator and Freezer
$100,000
The walk-in refrigerator and freezer at the Food Pantry are over 15 years old and nearing the end of their useful life. Freezer failure could easily mean the loss of 10,000 pounds of frozen product (much more when fully stocked). The Pantry would also be unable to receive large donations of frozen products when they are offered. This project will replace both of the units.
Renovate Sanctuary
$740,000
The sanctuary will receive a new one-level chancel, new carpet and reupholstered pews, and improved lighting. The sanctuary walls will be painted. The AV system will receive upgrades.
Install Solar Panels
$250,000
Solar panel installation on the roof of the Antioch facility is already under way, to take advantage of federal tax incentives that expired at the end of 2025. Estimated energy savings is $26,000 annually.
Replenish Trustee Reserve
$1,600,000 (all campuses)
In the last two years the Trustee Reserve has been depleted to fund exterior work at Mission Campus and the Friendship Hall renovation. The reserve is used to fund significant capital repairs and projects outside of a capital campaign. With over 350,000 sqft to maintain, replenishing this emergency reserve will help us respond to unexpected building issues.
Improve Parking Lots
$382,000
Both the north and south parking lots need repaving and improved lighting.
Art Installation
$50,000
Commission an outdoor sculptural piece honoring Village's 75 years and welcoming future generations.
Improve Parking Lots
$382,000
Both the north and south parking lots need repaving and improved lighting.
Renovate Fellowship Hall
$568,000
This project will remove the movable partitions, install a new ceiling, install new flooring, update lighting and improve the room’s AV capabilities.
Convert to Energy Efficient LED Lights
$200,000 (both campuses)
This project will replace original fluorescent lights at Mission and Antioch with energy efficient LED lights. Some lights have already been replaced, such as in Room 15 (the Sewing Room at Mission Campus)—what a difference brighter lights make!
Redesign Youth Loft and 3rd Floor Offices
$300,000
This project will create new offices for the Youth Ministry staff in the current Youth Loft. The existing 3rd floor offices will be refreshed and updated for use by other staff.
Convert to Energy Efficient LED Lights
$200,000 (both campuses)
This project will replace original fluorescent lights at Mission and Antioch with energy efficient LED lights. Some lights have already been replaced, such as in Room 15 (the Sewing Room at Mission Campus)—what a difference brighter lights make!
Replace Carpet in the Business Office
$50,000
The Business Office area carpet is not in good shape. It is unglued, fraying, and wrinkled, presenting a safety/trip hazard. Some of the carpet is over 40 years old.
Village Food Pantry volunteers Sharon Marsh and grandson Jack share about what the capital campaign will mean for the Food Pantry.
Improve Parking Lots
$382,000
Both the north and south parking lots need repaving and improved lighting.
Establish Endowment for the Food Pantry
$1,000,000
This project will establish an endowment for the Food Pantry & Clothes Closet, providing the foundation for long-term financial security for one of Village's most enduring missions.
Refresh 2nd Floor Office Suite
$100,000
This project will refresh the offices of Congregational Care, Adult Faith Formation, Engagement, and Worship/Young Adult Ministries. It will include soundproofing between two offices, a necessary measure for maintaining confidentiality in congregational care.
Friendship Hall and Restroom Renovation
$694,000
The project costs exceed a $1 million lead gift. The restrooms in the corridor outside of Friendship Hall are in dire need of renovation, with plumbing/pipe issues routinely impacting offices directly below the restrooms. The already completed Friendship Hall renovation project did not include these restrooms.
Install Choir Risers and Update Chancel
$300,000
The current choir risers were installed 10 years ago as a temporary fix; this project will install permanent risers and will enhance the performance of the many groups who perform in the sanctuary. In addition, the project will fund new chairs for the choir and the pastors/liturgists.
Education Wing Security
$250,000
The safety of the children enrolled in childcare and the preschool is a top priority. This project will install security doors on floors 2 and 3 of the Education Wing, restricting public access from the rest of the building.
HVAC Improvements
$172,000 (both campuses)
The HVAC system at Mission Campus was installed over many years and is not efficient. This project will install variable speed pumping to increase efficiency and energy savings. At Antioch Campus, new programmable thermostats will be installed.
HVAC Improvements
$172,000 (both campuses)
The HVAC system at Mission Campus was installed over many years and is not efficient. This project will install variable speed pumping to increase efficiency and energy savings. At Antioch Campus, new programmable thermostats will be installed.
Education Wing Security
$250,000
The safety of the children enrolled in childcare and the preschool is a top priority. This project will install security doors on floors 2 and 3 of the Education Wing, restricting public access from the rest of the building.
Village members Jenni and Trent Pittman share about the capital campaign's exciting potential impact on the Antioch Campus.
Replace Fire Suppression System
$750,000
The existing fire suppression system was cobbled together over many years as new buildings were added to the Mission Campus footprint and does not meet current fire codes, presenting a significant safety risk. The project will install a completely new fire alarm and suppression system throughout the building.
Convert to Energy Efficient LED Lights
$200,000 (both campuses)
This project will replace original fluorescent lights at Mission and Antioch with energy efficient LED lights. Some lights have already been replaced, such as in Room 15 (the Sewing Room at Mission Campus)—what a difference brighter lights make!
Refresh Preschool and Children's Wing
$100,000
The Education Wing and Preschool will be refreshed with paint and repair projects.
Refresh Preschool and Children's Wing
$100,000
The Education Wing and Preschool will be refreshed with paint and repair projects.
Capital Campaign Projects
Madeline Chamberlain
Created on February 4, 2026
Start designing with a free template
Discover more than 1500 professional designs like these:
View
Discover Your AI Assistant
View
Urban Illustrated Presentation
View
Geographical Challenge: Drag to the map
View
Decisions and Behaviors in the Workplace
View
Tangram Game
View
Process Flow: Corporate Recruitment
View
Weekly Corporate Challenge
Explore all templates
Transcript
Mission Campus 1st Floor
6641 Mission Rd.
Business Office
South Parking Lot
North Parking Lot
1st Floor
Education Wing
Office Suite
Mission Campus Main Floor
6641 Mission Rd.
Chancel
Friendship Hall
Bathroom
Main Floor
Mission Campus 3rd Floor
Education Wing
6641 Mission Rd.
Youth Loft
Office Suite
3rd Floor
Antioch Campus Main Floor
Nursery
14895 Antioch Rd.
FellowshipHall
Main Floor
Sanctuary
Preschool
Antioch Campus First Floor/Basement
14895 Antioch Rd.
Basement
Playground
Antioch Campus Roof
Roof
14895 Antioch Rd.
Food Pantry &Clothes Closet
Walk-in Cooler& Freezer
9960 Mission Rd.
Improve Parking Lots
$382,000
Both the north and south parking lots need repaving and improved lighting.
Replace Walk-In Refrigerator and Freezer
$100,000
The walk-in refrigerator and freezer at the Food Pantry are over 15 years old and nearing the end of their useful life. Freezer failure could easily mean the loss of 10,000 pounds of frozen product (much more when fully stocked). The Pantry would also be unable to receive large donations of frozen products when they are offered. This project will replace both of the units.
Renovate Sanctuary
$740,000
The sanctuary will receive a new one-level chancel, new carpet and reupholstered pews, and improved lighting. The sanctuary walls will be painted. The AV system will receive upgrades.
Install Solar Panels
$250,000
Solar panel installation on the roof of the Antioch facility is already under way, to take advantage of federal tax incentives that expired at the end of 2025. Estimated energy savings is $26,000 annually.
Replenish Trustee Reserve
$1,600,000 (all campuses)
In the last two years the Trustee Reserve has been depleted to fund exterior work at Mission Campus and the Friendship Hall renovation. The reserve is used to fund significant capital repairs and projects outside of a capital campaign. With over 350,000 sqft to maintain, replenishing this emergency reserve will help us respond to unexpected building issues.
Improve Parking Lots
$382,000
Both the north and south parking lots need repaving and improved lighting.
Art Installation
$50,000
Commission an outdoor sculptural piece honoring Village's 75 years and welcoming future generations.
Improve Parking Lots
$382,000
Both the north and south parking lots need repaving and improved lighting.
Renovate Fellowship Hall
$568,000
This project will remove the movable partitions, install a new ceiling, install new flooring, update lighting and improve the room’s AV capabilities.
Convert to Energy Efficient LED Lights
$200,000 (both campuses)
This project will replace original fluorescent lights at Mission and Antioch with energy efficient LED lights. Some lights have already been replaced, such as in Room 15 (the Sewing Room at Mission Campus)—what a difference brighter lights make!
Redesign Youth Loft and 3rd Floor Offices
$300,000
This project will create new offices for the Youth Ministry staff in the current Youth Loft. The existing 3rd floor offices will be refreshed and updated for use by other staff.
Convert to Energy Efficient LED Lights
$200,000 (both campuses)
This project will replace original fluorescent lights at Mission and Antioch with energy efficient LED lights. Some lights have already been replaced, such as in Room 15 (the Sewing Room at Mission Campus)—what a difference brighter lights make!
Replace Carpet in the Business Office
$50,000
The Business Office area carpet is not in good shape. It is unglued, fraying, and wrinkled, presenting a safety/trip hazard. Some of the carpet is over 40 years old.
Village Food Pantry volunteers Sharon Marsh and grandson Jack share about what the capital campaign will mean for the Food Pantry.
Improve Parking Lots
$382,000
Both the north and south parking lots need repaving and improved lighting.
Establish Endowment for the Food Pantry
$1,000,000
This project will establish an endowment for the Food Pantry & Clothes Closet, providing the foundation for long-term financial security for one of Village's most enduring missions.
Refresh 2nd Floor Office Suite
$100,000
This project will refresh the offices of Congregational Care, Adult Faith Formation, Engagement, and Worship/Young Adult Ministries. It will include soundproofing between two offices, a necessary measure for maintaining confidentiality in congregational care.
Friendship Hall and Restroom Renovation
$694,000
The project costs exceed a $1 million lead gift. The restrooms in the corridor outside of Friendship Hall are in dire need of renovation, with plumbing/pipe issues routinely impacting offices directly below the restrooms. The already completed Friendship Hall renovation project did not include these restrooms.
Install Choir Risers and Update Chancel
$300,000
The current choir risers were installed 10 years ago as a temporary fix; this project will install permanent risers and will enhance the performance of the many groups who perform in the sanctuary. In addition, the project will fund new chairs for the choir and the pastors/liturgists.
Education Wing Security
$250,000
The safety of the children enrolled in childcare and the preschool is a top priority. This project will install security doors on floors 2 and 3 of the Education Wing, restricting public access from the rest of the building.
HVAC Improvements
$172,000 (both campuses)
The HVAC system at Mission Campus was installed over many years and is not efficient. This project will install variable speed pumping to increase efficiency and energy savings. At Antioch Campus, new programmable thermostats will be installed.
HVAC Improvements
$172,000 (both campuses)
The HVAC system at Mission Campus was installed over many years and is not efficient. This project will install variable speed pumping to increase efficiency and energy savings. At Antioch Campus, new programmable thermostats will be installed.
Education Wing Security
$250,000
The safety of the children enrolled in childcare and the preschool is a top priority. This project will install security doors on floors 2 and 3 of the Education Wing, restricting public access from the rest of the building.
Village members Jenni and Trent Pittman share about the capital campaign's exciting potential impact on the Antioch Campus.
Replace Fire Suppression System
$750,000
The existing fire suppression system was cobbled together over many years as new buildings were added to the Mission Campus footprint and does not meet current fire codes, presenting a significant safety risk. The project will install a completely new fire alarm and suppression system throughout the building.
Convert to Energy Efficient LED Lights
$200,000 (both campuses)
This project will replace original fluorescent lights at Mission and Antioch with energy efficient LED lights. Some lights have already been replaced, such as in Room 15 (the Sewing Room at Mission Campus)—what a difference brighter lights make!
Refresh Preschool and Children's Wing
$100,000
The Education Wing and Preschool will be refreshed with paint and repair projects.
Refresh Preschool and Children's Wing
$100,000
The Education Wing and Preschool will be refreshed with paint and repair projects.