Krones Interactive Training

Start

Pre-Production Training Part 1: Krones Filler

Please select the very first step for Pre-Production. Hint - It requires changing the production/cleaning program.
Please select the second step for Pre-Production.
Which button do you select to ensure the correct can size and the gas is loaded?
Which button do you press to begin the required height values for the can size?
In the Height adjustment system tab what is the very first button to press in order to start the height adustment process?
Next what would be the second button in the Height adjustment systems tab in order to start setting the actual values?
After the values have been adjusted for the can size, what is the final button to press in the Height adjustment systems tab in order to start the actual Pre-Production process?
Which button do you press in order to properly exit the Height adjustment system tab to start Pre-Production?
After finishing the height adjustment, what is the first button in the production tab to start the Pre-production process?
What is the first button you press after pressing production control for Pre-production?
What is the final button within production control to press in order to move forward? Hint- This involves leaving this page
[0002] 0002 0,3541 can 11oz Nitrous
Production Preparation
Production Preparation
Monitor the product
What is the first thing you want to ensure in the type change screen?
Abort
Acknowledge
End of production by product treatment systems
Activate
Abort
[0002] 0002 0,3541 can 11oz Nitrous
Production Preparation
Production Preparation
Monitor the product
What is the second button out of the two check boxes you would want to press? Production Preparations? or Monitor the Product?
Abort
Acknowledge
End of production by product treatment systems
Activate
Abort
[0002] 0002 0,3541 can 11oz Nitrous
Production Preparation
Production Preparation
Monitor the product
What is the third button you will want to press?
Abort
Acknowledge
End of production by product treatment systems
Activate
Abort
[0002] 0002 0,3541 can 11oz Nitrous
Production Preparation
Production Preparation
Monitor the product
What are the final two buttons you will want to press to finish the Pre-production process in the Krones Filler?
Abort
Acknowledge
End of production by product treatment systems
Activate
Abort
For the final question, what are two physical main things you want to check within the filler buttons before transfering to the contiflow?

Congratulations!

You have completed part 1 of the Krones Pre-productions training course.

You can always go back and restart the training anytime or you may start part 2 when you are ready.

Pre-Production Training Part 2: Contiflow

What is the first thing to ensure in the Contiflow in Pre-Production?Hint - It is similar to what you would do for the very first step in the Krones Filler in part 1

What is the next button you will want to press in order to set up the type of product you will be running? Hint - This will require leaving the production page at the bottom.

Which two out of the eight buttons on the left-hand side would you select depending on the type of coffee product you would be running within the production schedule for the day?

After selecting the correct type of coffee product to run within the Contiflow, what button would you press to ensure that it is in the system?

What button will you want to press next in order to move forward from the Type page?

What button would you want to ensure is turned off in the functions tab?

What button will you want to press to leave the functions page?

What is the next button you will need to press in the Production Tab to move forward?

Multiple Choice

For the last section of Part 2 in Pre-Production, you will be given two multiple choice questions. These questions will surround step 28 in the Standard Work Instructions in the Contiflow. After you have answered each question correctly, the interactive training will show you an example from the SWI for further understanding.

1/2

2/2

Congratulations!

You have completed part 2 of the Krones Pre-productions training course.

You can always go back and restart the training anytime or you may start part 3 when you are ready.

Pre-Production Training Part 3: Variospin

What is the page you will want to press in order to change the program selection?

Select the correct program selection for Pre-Production

What is the next page you will want to go to to set up for production?

Select the correct button in the type menu to enable production in the Variospin.

What is the next button you will need to press to move forward?

What do you want to ensure in the production tab after you selected the correct button in the type menu?

What is the next page you will want to select from the production page?

What is the correct sequence you will want to make sure is turned on in order to start the draining process? Hint - It will be towards the bottom of the Functions page.

Multiple Choice

For the last section of Part 3 in Pre-Production, you will be given multiple choice questions. These questions will surround between step 34 - 39 in the Standard Work Instructions in the Variospin. After you have answered each question correctly, the interactive training will show you an example from the SWI for further understanding.

1/6

2/6

3/6

4/6

5/6

6/6

After the rining is done you will then open the PID tab. Select the correct area in which you will begin to install the drip head in the Krones Filler once indicated.

1/1

Congratulations!

You have completed part 3 of the Krones Pre-productions training course.

You can always go back and restart the training anytime or you may start part 4 when you are ready.

Pre-Production Training Part 4: Contiflow Part 2

Multiple Choice

For Part 4 in Pre-Production, you will be given multiple choice questions. These questions will surround between step 43-44 in the Standard Work Instructions in the Variospin. After you have answered each question correctly, the interactive training will show you an example from the SWI for further understanding.

1/2

After the desired gallons have been reched what are the final buttons to press in the contiflow to begin production?

2/2

Congratulations!

You have completed part 4 of the Krones Pre-productions training course.

You can always go back and restart the training anytime or you may start part 5 when you are ready.

Pre-Production Training Part 5: Krones Filler Part 2

Multiple Choice

For Part 5 in Pre-Production, you will be given multiple choice questions. These questions will surround between step 46-48 in the Standard Work Instructions in the Krones Filler. After you have answered each question correctly, the interactive training will show you an example from the SWI for further understanding.

1/3

2/3

3/3

Congratulations!

You have completed all of the parts of the Krones Pre-productions training course.

You can always go back and restart the training at any time. Great work!