Can the Bank's team view the semi-annual report Module, while the Executor creates and modifies the report? 
35
Can I make changes to the report after I have sent it? 
29
What happens if I made a mistake in the report and it has already been sent? 
30
In the semi-annual report for the second half of the year (July to December) should I report the progress for that half or for the whole year? 
34
Is there a limit to the number of characters in the fields to be completed in the semi-annual report? 
33
What should I do if the results matrix does not specify the means of verification or justification for the indicator? 
13
Does the update of information in the semiannual report module automatically reflect in Convergence? 
9
Why can't I generate the semiannual report? 
2
SEMI-ANNUAL
REPORT
FAQs | 
How is the approval flow for the semi-annual report managed? 
32
How can I view the semi-annual report I have submitted? 
31
How do I know if I have correctly sent the sem-iannual report?
28
Can I continue editing the report if I have not yet sent it to the Bank? 
27
If I make changes to the report after it has been sent, how does the Bank know what was modified? 
26
How is the final report sent to the Bank? 
25
What happens if I need to make changes to the report after sending it? 
23
How can I know if I have completed all the required sections of the report? 
22
Does the Bank store the attachments within the system? 
21
How can additional documents be attached to the semi-annual report? 
20
Is it mandatory to add a lesson learned in the
semi-annual report? 
19
What happens if a risk was recently updated by the operations analyst? 
18
How is the risk matrix managed in the report? 
17
Where can I find detailed instructions on how to use the module?
12
How do validations work in the Results Matrix Section? 
15
Can multiple users work simultaneously on the same report? 
14
How are notifications handled within the module? 
11
In what language is the
semi-annual report generated? 
10
How is the report generated in PDF and what information does it include? 
24
What information is mandatory to report progress on a product? 
16
Can I edit the information in the results matrix within the semiannual report module? 
7
In the results matrix section, which version is preloaded in the report? 
6
How many sections does the report have? 
5
Does the report need to be completed sequentially? 
4
How do I know if I need to complete the semiannual report? 
3
What is the system closure date? 
1
How is P, P(a), and A calculated in the Results Matrix?
8