The coastal tram

Proposal and evaluation about a new tramway line between Vil·la Olímpica and Poblenou
Rambla del Poblenou
Nova Icària
Llevant
Diagonal Mar
Mar Bella
Port Olímpic
Victor Rodriguez Alba, Eduard Roig Hoces, Clemente Gracia Ruiz, Izan Pomer Llovet
Introduction and state-of-art
Diagnostics at the maritime front
Alternatives and final proposal
contents
Evaluation
Future proposals
Conclusion

Why a tram?

Mobility diagnosis on the maritime front

Justification

PDI 2001-2010 (ATM)

PDI 2001-2010 (ATM)

Section1
Section2
Section3
Section4

PDI 2001-2010 (ATM)

PDI 2001-2010 (ATM)

PDI 2001-2010 (ATM)

PDI 2001-2010 (ATM)

Alternatives

+ 6 more alternatives

Explotation Method

Evaluation - Multicriteria Methodology

Alternatieves

Criteria

30%

A0. Current situation: H16

Maximize demand

A1. Main alternative: Av. Icàra and the first sea line. of Paseo Garcia

20%

Improve public transport

A2. Calle Salvador Espriu

15%

Minimize environmental impact and externalities

A3. Paseo Taulat.

Results

20%

A4. 1 direction along Calle Taulat

Maximize profitability and economic efficiency

A5. 2 directions along Calle Taulat

15%

Maximize urban insertion

A6. Avenida Litoral: Paseo Marítim.

Final Results

Principal is the most recommended for the Eix Litoral line, as it obtained the highest final score. Specifically, it stands out in the first two, Maximize the demand served, Improve the public transport system (connectivity, accessibility, operating efficiency. . . )

Future Proposals

Pla Director d'Infraestructures (PDI) 2011-2020

CONCLUSIONS

Alternatives for the new tram line along the Coastal Axis
Evaluation using Multicriteria Analysis
Main alternative the best option