The coastal tram
Proposal and evaluation about a new tramway line between Vil·la Olímpica and Poblenou
Rambla del Poblenou
Nova Icària
Llevant
Diagonal Mar
Mar Bella
Port Olímpic
Victor Rodriguez Alba, Eduard Roig Hoces, Clemente Gracia Ruiz, Izan Pomer Llovet
Introduction and state-of-art
Diagnostics at the maritime front
Alternatives and final proposal
contents
Evaluation
Future proposals
Conclusion
Why a tram?
Mobility diagnosis on the maritime front
Justification
PDI 2001-2010 (ATM)
PDI 2001-2010 (ATM)
Section1
Section2
Section3
Section4
PDI 2001-2010 (ATM)
PDI 2001-2010 (ATM)
PDI 2001-2010 (ATM)
PDI 2001-2010 (ATM)
Alternatives
+ 6 more alternatives
Explotation Method
Evaluation - Multicriteria Methodology
Alternatieves
Criteria
30%
A0. Current situation: H16
Maximize demand
A1. Main alternative: Av. Icàra and the first sea line. of Paseo Garcia
20%
Improve public transport
A2. Calle Salvador Espriu
15%
Minimize environmental impact and externalities
A3. Paseo Taulat.
Results
20%
A4. 1 direction along Calle Taulat
Maximize profitability and economic efficiency
A5. 2 directions along Calle Taulat
15%
Maximize urban insertion
A6. Avenida Litoral: Paseo Marítim.
Final Results
Principal is the most recommended for the Eix Litoral line, as it obtained the highest final score. Specifically, it stands out in the first two, Maximize the demand served, Improve the public transport system (connectivity, accessibility, operating efficiency. . . )
Future Proposals
Pla Director d'Infraestructures (PDI) 2011-2020
CONCLUSIONS
Alternatives for the new tram line along the Coastal Axis
Evaluation using Multicriteria Analysis
Main alternative the best option
The coastal tramway
Clemente Garcia Ruiz
Created on November 27, 2024
Start designing with a free template
Discover more than 1500 professional designs like these:
View
Interactive Onboarding Guide
View
Corporate Christmas Presentation
View
Business Results Presentation
View
Meeting Plan Presentation
View
Customer Service Manual
View
Business vision deck
View
Economic Presentation
Explore all templates
Transcript
The coastal tram
Proposal and evaluation about a new tramway line between Vil·la Olímpica and Poblenou
Rambla del Poblenou
Nova Icària
Llevant
Diagonal Mar
Mar Bella
Port Olímpic
Victor Rodriguez Alba, Eduard Roig Hoces, Clemente Gracia Ruiz, Izan Pomer Llovet
Introduction and state-of-art
Diagnostics at the maritime front
Alternatives and final proposal
contents
Evaluation
Future proposals
Conclusion
Why a tram?
Mobility diagnosis on the maritime front
Justification
PDI 2001-2010 (ATM)
PDI 2001-2010 (ATM)
Section1
Section2
Section3
Section4
PDI 2001-2010 (ATM)
PDI 2001-2010 (ATM)
PDI 2001-2010 (ATM)
PDI 2001-2010 (ATM)
Alternatives
+ 6 more alternatives
Explotation Method
Evaluation - Multicriteria Methodology
Alternatieves
Criteria
30%
A0. Current situation: H16
Maximize demand
A1. Main alternative: Av. Icàra and the first sea line. of Paseo Garcia
20%
Improve public transport
A2. Calle Salvador Espriu
15%
Minimize environmental impact and externalities
A3. Paseo Taulat.
Results
20%
A4. 1 direction along Calle Taulat
Maximize profitability and economic efficiency
A5. 2 directions along Calle Taulat
15%
Maximize urban insertion
A6. Avenida Litoral: Paseo Marítim.
Final Results
Principal is the most recommended for the Eix Litoral line, as it obtained the highest final score. Specifically, it stands out in the first two, Maximize the demand served, Improve the public transport system (connectivity, accessibility, operating efficiency. . . )
Future Proposals
Pla Director d'Infraestructures (PDI) 2011-2020
CONCLUSIONS
Alternatives for the new tram line along the Coastal Axis
Evaluation using Multicriteria Analysis
Main alternative the best option