INTERIM PLAN CONSTRUCTION

James River

FINAL PLAN CONSTRUCTION

The Interim Plan identified ten projects that will reduce CSO volume by approximately 180 million gallons on average per year. These projects are on track to be complete by July 1, 2027 to comply with the City’s Consent Order deadlines.

4

3

2

5

6

7

9

8

1

10

Project in Design Phase​

COMBINED SEWER SYSTEM

WATER BODY

SEPARATE SEWER SYSTEM

Project in Construction Phase​

CSO 019B Diversion

CSO 020 Diversion

CSO 040 Inline Storage

CSO 019A Diversion

Level 2 Controls

CSO 021 Inline Storage

Level 1 Controls

CSO 004 Regulator Replacement

CSO 039 Underflow Control

CSO 024 Underflow Control

INTERIM PLAN CONSTRUCTION

James River

FINAL PLAN CONSTRUCTION

The Final Plan report was approved by the Virginia Department of Environmental Quality on August 8, 2024. This plan identified four projects that will exceed the performance requirements of the City’s 2005 Consent Order and further assist the City in meeting the 2010 James River Bacteria TMDL for the Gillies Creek and Almond Creek tributaries.

1

4

3

2

Project in Design Phase​

COMBINED SEWER SYSTEM

WATER BODY

SEPARATE SEWER SYSTEM

Project in Planning Phase​

SOUTHSIDE #1 STORAGE FACILITY

Shockoe #1 HRD Facility

Gillies Creek # 1 Storage Facility

Hilton Street #1 CSS Separation

INTERIM PLAN CONSTRUCTION PROJECT

Level 1 Controls (SRB and Hampton/McCloy Tunnel)

Purpose: Automate the drainage of the 35-MG Shockoe Retention Basin and the 7-MG Hampton/McCloy storage tunnel. Annual Overflow Volume Reduction (MG): 79Construction Cost: $2 MEstimated Completion Date: Fall 2025

INTERIM PLAN DESIGN PROJECT

CSO 040 Inline Storage

Purpose: Installation of a new in-line storage structure.Annual Overflow Volume Reduction (MG): 12Construction Cost: $4 MEstimated Completion Date: Fall 2026

FINAL PLAN CONSTRUCTION PROJECT

Southside #1 Storage Facility

Purpose: New storage facility that will reduce approximately 25 overflow events per year.Annual Overflow Volume Reduction (MG): 83Construction Cost: $160 MEstimated Completion Date: Fall 2034

INTERIM PLAN CONSTRUCTION PROJECT

CSO 039 Underflow Control

Purpose: Install controls to convey additional wet weather flow to downstream sewer as capacity is available.Annual Overflow Volume Reduction (MG): 4Construction Cost: $1 MEstimated Completion Date: Fall 2025

FINAL PLAN CONSTRUCTION PROJECT

Shockoe #1 High-Rate Disinfection Facility

Purpose: New 1,000-MGD high-rate disinfection facility that will be constructed within the existing Shockoe Retention Basin.Annual Overflow Volume Reduction (MG): 691Construction Cost: $340 MEstimated Completion Date: Fall 2034

FINAL PLAN DESIGN PROJECT

Gillies Creek #1 Storage Facility

Purpose: New storage facility that will reduce approximately 12 overflow events to Gillies Creek per year.Annual Overflow Volume Reduction (MG): 4Construction Cost: $30 MEstimated Completion Date: Fall 2026

INTERIM PLAN DESIGN PROJECT

CSO 019B Diversion

Purpose: Install controls to divert flow between the Shockoe Retention Basin and the Hampton/McCloy storage tunnel.Annual Overflow Volume Reduction (MG): 2Construction Cost: $1 MEstimated Completion Date: Fall 2026

INTERIM PLAN DESIGN PROJECT

CSO 020 Diversion

Purpose: Install controls to divert flow between the Shockoe Retention Basin and the Hampton/McCloy storage tunnel.Annual Overflow Volume Reduction (MG): 9Construction Cost: $2 MEstimated Completion Date: Summer 2026

INTERIM PLAN DESIGN PROJECT

CSO 019A Diversion

Purpose: Install controls to divert flow between the Shockoe Retention Basin and the Hampton/McCloy storage tunnel.Annual Overflow Volume Reduction (MG): 10Construction Cost: $1 MEstimated Completion Date: Fall 2026

CSO 004 Regulator Replacement

Purpose: Regulator replacement to provide inline storage and convey additional wet weather flow to downstream sewer as capacity is available. Annual Overflow Volume Reduction (MG): 5Construction Cost: $17 MEstimated Completion Date: Summer 2025

INTERIM PLAN CONSTRUCTION PROJECT

INTERIM PLAN DESIGN PROJECT

Level 2 Controls (WWTP Main PS)

Purpose: Optimize the operation of the WWTP Main PS to maximize the use of the 140 MGD WWTP. Annual Overflow Volume Reduction (MG): 41Construction Cost: $0.5 MEstimated Completion Date: Spring 2026

INTERIM PLAN DESIGN PROJECT

CSO 021 Inline Storage

Purpose: Regulator Replacement to utilize in-line storage. Annual Overflow Volume Reduction (MG): 16Construction Cost: $5 MEstimated Completion Date: Fall 2026

FINAL PLAN DESIGN PROJECT

Hilton Street #1 CSS Separation

Purpose: Separation of the Hilton Street drainage area that will remove CSO overflow events to Almond Creek.Annual Overflow Volume Reduction (MG): 7Construction Cost: $35 MEstimated Completion Date: Fall 2026

INTERIM PLAN CONSTRUCTION PROJECT

CSO 024 Underflow Control

Purpose: Install controls to convey additional wet weather flow to downstream sewer as capacity is available.Annual Overflow Volume Reduction (MG): 4Construction Cost: $0.5 MEstimated Completion Date: Fall 2025