LAPR3_G71_PRESENTATION

cotcha

Created on November 4, 2024

Start designing with a free template

Discover more than 1500 professional designs like these:

Transcript

Grupo G071

LAPR3 Presentation

Nº de estudante: 1230927 Turma: DG

Nº de estudante: 1231017 Turma: DH

Nº de estudante: 1231031 Turma: DG

Grupo G071
José Ribeiro
Diogo Campos
Rafael Costa

Nº de estudante: 1231267 Turma: DG

Rúben Freitas

TEAM

Real Solution
Conclusion
Concept Solution
Problem
index

Production Planning and Control

Complexity in Production Management

There is a need to coordinate production orders efficiently to meet deadlines and demand.

The management of industrial facilities, products, machines and operations requires high levels of organization and information integration for the most efficient production possible.

Production in industrial environments requires a high level of organization and control to ensure efficiency.

PROBLEM

Our project consists of a production simulator, which processes information about articles, machines and their operations, and simulates the complete production flow. It offers:

  • Execution times: Detailed calculation of the execution time for each operation;
  • Production time: Total Production time;
  • Waiting times: Detailed calculation of the waiting time for each operation.

Our solution brings clarity and precision to production planning, simulating processes to improve decisions and optimize results.

CONCEPT SOLUtion

Our simulator is made up of a sequence of essential steps that guarantee the accuracy and efficiency of the process. In the timeline below, we detail each processing step, from supplying the machines with the items to the intermediate and final time calculation phases.

rEAL SOLUtion

Final Time Skip

Step 4

Next Time Skip

Step 3

First Time Skip

Step 2

Filling machines with items

Step 1

Now we will do a demonstration of our product for this sprint...

  • Class Diagram
  • Unit Tests
  • JavaDoc
  • Relational Model
  • Domain Model
  • Glossary
  • Use Case Diagram
  • FURPS+
  • System Sequence Diagram

OTHERS

3 s

8 s

Current Time: 12s

Waiting Times: 10s 0s 0s

Maq4 - 10s

Maq3 - 5s

Step 3

Op3

Op2

Maq2 - 12s

Maq1 - 10s

Op1

  1. .
  2. .
  3. .

Articles Op1 | Op2 | Op3

5 s

10 s

2 s

Current Time: 10s

Waiting Times: 10s 0s 0s

Maq4 - 10s

Maq3 - 5s

Step 2

Op3

Op2

Maq2 - 12s

Maq1 - 10s

Op1

  1. .
  2. .
  3. .

Articles Op1 | Op2 | Op3

10 s

12 s

Current Time: 0s

Waiting Times: 0s 0s 0s

Maq4 - 10s

Maq3 - 5s

Op3

Op2

Maq2 - 12s

Maq1 - 10s

Op1

Step 1

  1. .
  2. .
  3. .

Articles Op1 | Op2 | Op3

5 s

5 s

Current Time: 15s

Waiting Times: 10s 3s 0s

Maq1 - 10s

Maq1 - 5s

Step 4

Op3

Op2

Maq2 - 12s

Maq1 - 10s

Op1

  1. .
  2. .
  3. .

Articles Op1 | Op2 | Op3