IPS08 Position and Install plant, equipment and systems.

Unit IPS08

Ryan Britland

Job 1: Installing a Cooling System in a Confined Space

Job 2

For this job, I worked on installing a cooling system in a confined space, setting up the main coolant pipes and support brackets while making the most of a restricted area.Preparation and Setup:I started by going through the technical drawings and specs, noting the layout of the cooling system and checking out the space available. I gathered the tools I’d need, like adjustable and torque wrenches, and made sure all safety gear, especially for confined spaces, was in place. Since it was a small area, it was critical to have the right PPE and ensure safe entry and exit.Positioning and Installation:With everything prepped, I began marking where the cooling pipes and brackets would go, ensuring everything lined up with the layout. Using lifting tools, I placed the pipes as specified and secured them with support brackets. The tight space made it tricky to reach some joints, but with flexible and extended tools, I fastened each connection securely. I double-checked alignment with the drawings to make sure everything was set to avoid future issues.Final Checks:After installation, I inspected all connections to make sure they were secure, running a quick pressure test to check for leaks. With the pipes aligned and everything looking good, I documented the steps I took and flagged the area for final inspection.

Job 2: Setting Up Main Pipework with Anti-Vibration Supports

This job involved installing a section of main pipework with anti-vibration mounts to keep the system stable and cut down on vibrations that might affect nearby equipment.Preparation and Inspection:I reviewed the pipe layout on the drawings and prepped the workspace, making sure it was clear and safe. After gathering my tools—pipe cutters, measuring tools, and mounting equipment—I checked each one for safety compliance and gave the anti-vibration mounts a quality check as well.Mounting and Positioning:I started by positioning the first pipe section, aligning it to the exact coordinates on the drawings. Since the pipes ran close to other equipment, careful placement was essential. I attached the anti-vibration supports at key points along the route, securing them with high-tensile fasteners torqued to spec. I followed a sequential tightening process to distribute the load evenly, avoiding any risk of misalignment.Testing and Documentation:With the pipework set, I did a vibration check to confirm that the supports were doing their job. I also checked dimensions and alignment against the drawings to make sure everything matched up. Once it was all verified, I completed the documentation for quality control and prepped the area for the final handover.

Results

IPS08 Position and Install plant, equipment and systems.

Tech Test

assesment plan

Next

Assessment Overview This plan outlines the assessment strategy for Unit IPS08: Position and Install plant, equipment and systems, which is part of the Engineering Construction Installing Plant and Systems qualification. Learning Outcome The candidate understands how to position and install plant, equipment and systems, and is able to do so safely and effectively to meet requirements, specifications and procedures. Assessment Methods Practical Skills Assessment Technical Discussion Practical Skills Assessment Setting: AO approved premises (live workplace or approved testing/assessment centre) Duration: Minimum of two separate observations Equipment: Relevant plant, equipment, and systems for the chosen pathway Assessment Criteria: The candidate must demonstrate the ability to: Follow relevant instructions, assembly drawings, and specifications Ensure specified components are available and meet quality standards Position components in the correct sequence and location using approved methods Secure components using specified connectors and securing devices Apply appropriate installation techniques (e.g., leveling, alignment, interfacing) Check the completed installation meets specifications and all operations are complete Assessor Responsibilities: Observe candidate performance Complete assessment records Provide feedback to the candidate

Project Management:Ability to manage pipework projects from conception to completion.Proficiency in planning, scheduling, budgeting, and resource allocation.Adherence to Comprehensive Industry Standards:Knowledge and application of comprehensive industry standards and codes.Ensuring all work complies with rigorous health and safety regulations.Resources Needed:Advanced design software and toolsComprehensive troubleshooting equipment (diagnostic tools, advanced measuring instruments)Project management tools (Gantt charts, project management software)Safety equipment (PPE, advanced safety gear, first aid kit)Documentation (comprehensive industry standards, safety manuals, project plans)Special Considerations:Ensure all safety procedures are strictly followed during practical assessments.Provide additional support or resources if the learner demonstrates a need for further development in any area.Feedback and Review:Immediate verbal feedback during practical assessments.Detailed written feedback following each assessment activity.Final review meeting to discuss overall performance, strengths, and areas for improvement.

assesment plan

Text button

Assessor's Feedback ReportRyan demonstrated strong skills in positioning and installing components, consistently meeting IPS08 standards with excellent attention to detail, safety, and alignment. Across both tasks, he followed specifications, managed hazards, and maintained effective team communication, creating a safe and efficient work environment.Feedback on Skills and Behaviors:Interpret Drawings and Specifications:Ryan accurately interpreted installation drawings, preparing each task with a clear understanding of alignment requirements, ensuring components were positioned correctly.Tool Selection and Safety Check:Ryan selected suitable tools, performed safety checks, and ensured all equipment, including PPE, matched job requirements. His careful approach to safety set a high standard on-site.Installation and Positioning:Ryan positioned and secured components accurately, handling minor alignment adjustments effectively and showing solid alignment skills.Secure Connections and Final Checks:After positioning, Ryan securely fastened each connection, with leak and pressure tests confirming the system’s integrity.Safety Awareness and Risk Management:Ryan demonstrated a strong safety focus, maintaining a safe workspace, using PPE, and effectively managing hazards, especially in confined spaces.Effective Communication:He kept the team informed with regular updates, ensuring alignment on task requirements, which minimized risks.Quality Focus and Conscientiousness:Ryan maintained high-quality standards, completed all work to specifications, and documented processes accurately.Initiative and Problem-Solving:He showed initiative, independently addressing minor alignment issues and adapting well to challenges, reflecting his growing proficiency.Overall Assessment:Ryan has excelled across IPS08 skills and behaviors, showing strong safety focus, attention to detail, and problem-solving skills. Continuing to refine alignment techniques will further enhance his efficiency.Assessor’s Recommendation:I recommend that Ryan continue developing his alignment precision to improve efficiency and reduce the need for adjustments.Signature:Steve Smith

Witness TestimonyLearner Name: Ryan BritlandWitness Name and Position: Steve Smith, Pipefitting Assessor/TutorDescription of Observation: I observed Ryan’s installation of a cooling system in a confined space, as well as his setup of main pipework with anti-vibration mounts. He demonstrated consistent safety practices, clear communication, and strong technical abilities in both tasks.Comments on Skills and Behaviors:Safety and Hazard Management: Ryan prepared the workspace thoroughly, managing risks with proactive hazard assessments. His commitment to using PPE and observing safety protocols was evident, particularly in the confined space installation.Technical Accuracy and Quality Control: Ryan followed technical drawings accurately, securing components to the correct specifications. His use of tools and alignment methods ensured a high-quality installation.Communication and Teamwork: Ryan kept the team informed and coordinated, maintaining open communication, which contributed to a smooth workflow.Problem-Solving and Initiative: When alignment challenges arose, Ryan resolved them independently, showing initiative and adaptability. His quick response to minor issues minimized delays and maintained quality standards.Overall Impression:Ryan’s work met IPS08 requirements, with a solid demonstration of safety, technical accuracy, and problem-solving. His ability to follow specifications, address challenges, and maintain high standards reflects his developing skill set and readiness for further responsibilities.Signature:Steve Smith

Digital beingsdigital

Social beingssocial

Annotated evidence

Place your mouse over the images for anotation.

Video link

This is the Valve before Installation.

This is where the valve is to be installed.

This is me installing the Valve.