Statistica Process Control

A tool to monitor and control processes conforming product and reduce the variances process

Where quality makes adjustments and reports

A program to enter the PQI checks

What is the SPC?

Question 01

Correct answer

Next

Every 15 minutes

After any downtime

Hourly

How often does a line operator need to enter the data into SPC?

Question 02

Correct answer

Next

To collect data

Helps us regulate consistent quality and cost serving

To make the job easier

Why SPC is important?

Question 03

Correct answer

Next

At the beginnig of the shift

Hourly

If any point falls outside of UCL or LCL or any point breaks SPC rules

When do we need to make an adjustment?

Question 04

Correct answer

Next

Call my Supervisor

Make an adjustment

Wait until quality show up

What do we need to do if we're 5 consecutive points increasing or degreasing?

Question 05

Correct answer

Next

Next

Hourly

Anytime a SPC rule is out of control limits

Every 15 minutes

When do we need to make an adjustment?

Question 06

Correct answer

Next

Control Limits

Lower Control Limits

Upper Control Limits

We always need to ensure that the SPC is within _______________.

Question 07

Correct answer

Next

When you are on target

When the data is outside MAV and if the LOT average is below the declared

When you do many changes on the SPC

When does quality hold product?

Question 08

Correct answer

Next

Decrease velocity

Add air/overrun from the freezer

Decrease air/ overrun from the freezer

If a cup weight is heavy, what do you need to do at the set point?

Question 09

Correct answer

Next

Added air from the freezer

Decrease air/overrun from the freezer

Added gallons/ from the freezer

If the cup weight is light, what do you need to do at the set point?

Question 10

Correct answer

Next

Add a comment and make an adujust

Select the best option and saved the data

Do a second check

What will a line operator need to do if 5 consecutive Points are Increasing or Decreasing?

Question 11

Correct answer

Next

1. Add gallons/ from the freezer2. Enter the data in the next hour 3. Always add a comment

1. Add air/overrun 2. Do another check in 15 minutes3. Enter the new data and do a PQI check

1. Decrease air/overrun 2. Do an adjustment3. Make another check in the next half an hour

What does a line operator need to do if they have a point outside the UCL?

Question 12

Correct answer

Next

Didn't do a check in 15 minutes

Had a late check

Did an unnecessary adjustment

What did the line operator do incorrectly?

Question 12

Correct answer

Next

Points below the Lower MAV

No broken rules

Point Falls Outside the Upper or Lower Control Limit

What rules do you see that were broken?

Question 13

Correct answer

Next

Need to do a next check to fixed and fix the problem

The batch for the day will be on hold.

Need to do his check in an hour and notify the supervisor

What would happen if a line operator runs points fall below the lower MAV?

Question 14

Correct answer

Next

1. Late check - line down 2. Late check trouble in the line

1. Late check trouble in the line 2. Late check

1. Late check line down2. Late check - busy

Which comment does a line operator need to add if your check if later than 65 minutes?

Question 15

Correct answer

Next

Congratulations you have complete the SPC Quiz !