Statistica Process Control

quiz

Start

Question 01

What is the SPC?

Where quality makes adjustments and reports

A tool to monitor and control processes conforming product and reduce the variances process

A program to enter the PQI checks

Correct answer

Next

Question 02

How often does a line operator need to enter the data into SPC?

After any downtime

Hourly

Every 15 minutes

Correct answer

Next

Question 03

Why SPC is important?

Helps us regulate consistent quality and cost serving

To make the job easier

To collect data

Correct answer

Next

Question 04

When do we need to make an adjustment?

Hourly

If any point falls outside of UCL or LCL or any point breaks SPC rules

At the beginnig of the shift

Correct answer

Next

Question 05

What do we need to do if we're 5 consecutive points increasing or degreasing?

Make an adjustment

Wait until quality show up

Call my Supervisor

Correct answer

Next

Next

Question 06

When do we need to make an adjustment?

Anytime a SPC rule is out of control limits

Every 15 minutes

Hourly

Correct answer

Next

Question 07

We always need to ensure that the SPC is within _______________.

Control Limits

Lower Control Limits

Upper Control Limits

Correct answer

Next

Question 08

When does quality hold product?

When the data is outside MAV and if the LOT average is below the declared

When you do many changes on the SPC

When you are on target

Correct answer

Next

Question 09

If a cup weight is heavy, what do you need to do at the set point?

Add air/overrun from the freezer

Decrease air/ overrun from the freezer

Decrease velocity

Correct answer

Next

Question 10

If the cup weight is light, what do you need to do at the set point?

Decrease air/overrun from the freezer

Added gallons/ from the freezer

Added air from the freezer

Correct answer

Next

Question 11

What will a line operator need to do if 5 consecutive Points are Increasing or Decreasing?

Select the best option and saved the data

Do a second check

Add a comment and make an adujust

Correct answer

Next

Question 12

What does a line operator need to do if they have a point outside the UCL?

1. Add gallons/ from the freezer 2. Enter the data in the next hour 3. Always add a comment

1. Add air/overrun 2. Do another check in 15 minutes 3. Enter the new data and do a PQI check

1. Decrease air/overrun 2. Do an adjustment 3. Make another check in the next half an hour

Correct answer

Next

Question 12

What did the line operator do incorrectly?

Had a late check

Did an unnecessary adjustment

Didn't do a check in 15 minutes

Correct answer

Next

Question 13

What rules do you see that were broken?

No broken rules

Point Falls Outside the Upper or Lower Control Limit

Points below the Lower MAV

Correct answer

Next

Question 14

What would happen if a line operator runs points fall below the lower MAV?

The batch for the day will be on hold.

Need to do his check in an hour and notify the supervisor

Need to do a next check and fixed the issue and enter the data into SPC

Correct answer

Next

Question 15

Which comment does a line operator need to add if your check if later than 65 minutes?

1. Late check trouble in the line 2. Late check

1. Late check line down 2. Late check - busy

1. Late check - line down 2. Late check trouble in the line

Correct answer

Next

Congratulations you have complete the SPC Quiz !

Wrong answer

Back