These sentences are missing from the text. Match a–f to gaps 1–6 in the text. Drag the letter corresponding to the sentence to their correct places. Tired of trying to find a good time for everyone to be in the same place at the same time? We thought that you needed to pay a lot for good scheduling software.
But this software isn’t only for managing projects, meeting deadlines, and organizing staff timetables. I think we integrated it within two weeks and didn’t waste time.
So now, no one has an excuse for being late or not turning up.
We’d even bought one, but it wasn’t satisfactory.
Click here to see the answer
1 c - 2 a - 3 e - 4 f - 5 b - 6 d
Bus Pre Inter 14 4
Pri
Created on October 10, 2024
Start designing with a free template
Discover more than 1500 professional designs like these:
View
Piñata Challenge
View
Teaching Challenge: Transform Your Classroom
View
Frayer Model
View
Math Calculations
View
Interactive QR Code Generator
View
Interactive Scoreboard
View
Interactive Bingo
Explore all templates
Transcript
These sentences are missing from the text. Match a–f to gaps 1–6 in the text. Drag the letter corresponding to the sentence to their correct places. Tired of trying to find a good time for everyone to be in the same place at the same time? We thought that you needed to pay a lot for good scheduling software. But this software isn’t only for managing projects, meeting deadlines, and organizing staff timetables. I think we integrated it within two weeks and didn’t waste time. So now, no one has an excuse for being late or not turning up. We’d even bought one, but it wasn’t satisfactory.
Click here to see the answer
1 c - 2 a - 3 e - 4 f - 5 b - 6 d