Want to make interactive content? It’s easy in Genially!

Transcript

[E-994772] Kyran Sewell ECITB Level 2 Diploma in Supporting the Installation of Engineering Construction Plant and Systems (RQF) - Plating

Start

Kyren SewellTechnical discussion

Work safely, effectively, ethically and sustainably, managing risk and hazards

Index

Home

SIPS01

SIPS07

SIPS02

SIPS03

SIPS05

SIPS08

SIPS04

SIPS06

Identify the most inappropriate of these comments about communication: L3B0116-B3​ What is NOT true of the relationship between change and stress?L3B0120-K28​ Which of the following statements about communication is not true? L3B0115-B3​ If risk is the likelihood and consequences of a hazard, which of the following is a risk? L3A0111-K18​ When we talk about Isolation of energy we mainly think about electricity, what other items could we consider when thinking about isolation practices?

SIPS01

Home

L20252-K1 What is the purpose of a method statement?L20243-K7 Who will be required to sign a work permit?L20275-K12 You need to use a 110 volt extension lead, how should you route it?

SIPS02

Home

PL0307-K3 What is meant by blast cleaning in material pre-treatment?PL0302-K4 When marking out a stainless steel plate what would be the correct marking medium to use?PL0312-K1 What is the procedure to check the correct version of the engineering drawing or specification?PL0309-K3 How should the surface of a carbon steel plate be prepared before marking out?

SIPS03

Home

PL0411-K3 How should you check that the required shaping had been completed to specification?PL0414-K1 Which of these machining operations is commonly used to cut structural steel sections?

SIPS04

Home

What information would you expect to find on a third angle projection drawing under the heading "Bill of Materials"? SIPS0502-K1If an engineering drawing is damaged what action should you take? SIPS0512-K1If you found that individual dimensions do not equal the overall dimensions on a drawing. Who do you report this to? SIPS0506-K1Which document shows what PPE must be worn when working with hazardous substances? SIPS0505-K1What is the purpose of using a 'pre-set' on materials during assembly? PL0517-K2

SIPS05

Home

PL0618-K2 What are key plates used for in the positioning and installation process?PL0625-K2 What can be used for lifting and positioning components which may be damaged by chains.PL0621-K1 When installing steelwork what principle does HSFG bolting rely upon?PL0613-K2 What is a transition piece used for during positioning and installation?PL0607-K4Whilst installing some steelwork and tightening a series of bolts to bring 2 pieces of a joint together each bolt shears before it has not reached the correct torque setting, what does this indicate? (Select two answers)

SIPS06

Home

PL0705-K2 How would you release stored energy in compressed gas hoses?PL0713-K2 What method is used to remove torque control bolts from a joint during dismantling?

SIPS07

Home

SIPS0814-K5MIG / GMAW welding is referred to as "semi-automatic". Which of the following are controlled automatically?SIPS0846-K5Which would be the most suitable tool for measuring the height of a weld bead contour?SIPS0801-K1"GMAW" is a common abbreviation in welding, what does it stand for?

SIPS08

Home