Want to create interactive content? It’s easy in Genially!

Get started free

FSK Facility Projects

phil.iacona

Created on August 13, 2024

Start designing with a free template

Discover more than 1500 professional designs like these:

Project Roadmap Timeline

Step-by-Step Timeline: How to Develop an Idea

Artificial Intelligence History Timeline

Museum Escape Room

Momentum: Onboarding Presentation

Urban Illustrated Presentation

3D Corporate Reporting

Transcript

Return

Return

Return

Return

Rehabilitation of Bearings and Miscellaneous Repairs of the Inner Loop I-695 Bridge over Bear Creek

Start Date: Spring 2026 End Date: Spring 2028

Project Location Map

Description:

  • Enhance the safety and longevity of the bridges carrying I-695 over Bear Creek in Baltimore County.
  • Spot cleaning and painting.
  • Repair or replacement of bearings on the bridges.

Drainage Improvements of I-695 at Quarantine Road

Start Date: Summer 2026 End Date: Summer 2027

Description:

  • Improve drainage along I-695 at the Quarantine Road interchange, while also considering risk assessment in the context of Climate Resiliency.

I-695 Repairs and Subgrade Rehabilitation On Sparrows Point Near Bear Creek

Start Date: March 2024 End Date: Summer/Fall 2025

Project Location Map

Description:

  • Subgrade (material under pavement) rehabilitation due to significant settlement and deterioration of a section of roadway located just east of the MD 157 (Peninsula Expressway) underpass.
  • Repairs to backwalls and approaches of the six bridges crossing Bear Creek, MD 157, and the Tradepoint Atlantic Railroad.

Shoreline Restoration at MDTA Police Headquarters

Start Date: Spring 2027 End Date: Summer 2028

Description:

  • Create a hybrid living shoreline to protect the eroding and impaired shoreline northeast and southeast of the MDTA's police headquarters.

Project Location Map

Curtis Creek Drawbridge Rehabilitation and Resiliency Project

Start Date: Fall 2025 End Date: Summer 2027

Project Location Map

Description:

  • Replacement of portions of the concrete decks and parapets and the repair of the steel girders adjacent to the main bridge spans that carry the Inner and Outer Loops of I-695 over Curtis Creek.
  • Local cleaning and painting operations of specific steel components, removal and reinstallation of existing warning gates, and removal and replacement of lower-level lights and traffic signals

Curtis Creek Bridge Substructure Improvements and Repairs

Start Date: Winter 2026 End Date: Fall 2028

Description:

  • Repair work on the substructure of the Curtis Creek Bridges on the Inner and Outer Loops of Interstate 695.
  • Replacement of waterproofing at all four bascule piers (those adjacent to the drawbridge spans).
  • Replacing the protective fender system along the navigational channel.
  • Replacement of pier sump pumps.
  • Replacement of navigational lighting beneath the drawbridge spans.

FSK Marine Police and Operations Dock

Start Date: Late 2026 End Date: Summer 2027

Description:

  • Construction a floating dock for MDTA Police and Operations vessels.
  • Construction of a breakwater at Sollers Point in Baltimore County, Maryland. This will provide essential protection for the MDTA Police and operations boats moored at Sollers Point.

Key Bridge Rebuild

Start Date: Anticipated Summer 2025 End Date: Anticipated Fall 2028

Description:

  • At approximately 1:30 a.m. on March 26, 2024, a cargo ship leaving the Port of Baltimore struck the (I-695) Francis Scott Key Bridge. This caused a collapse of the bridge.
  • On May 31, 2024, the MDTA released its Request for Proposals (RFP) inviting design-build teams to submit proposals for rebuilding the Francis Scott Key Bridge and reconnecting the I-695 Baltimore Beltway.
  • For this critical project, the MDTA is using a Progressive Design-Build process, which brings on board a project delivery team under one entity and a single contract to provide both design and construction services. The MDTA will work to foster collaboration among the project team, local communities and stakeholders, ensuring open communication and inclusive partnership opportunities, particularly for small and disadvantaged businesses. The project scope of work and accelerated timeline will require a substantial amount of skilled labor to complete the construction expeditiously, safely and reliably.
  • On August 29, 2024, the MDTA approved a $73 million contract (Phase 1) that awards Kiewit Infrastructure Co. as the Progressive Design-Builder that will undertake the complete design and construction of the I695 Francis Scott Key Bridge replacement.