CAHV Commissioning waterside
Commissioning:
- Waterpipe should be clean and watertight
- Ensure all valve are open
- Switch on water pumps
- Set up pump and commissioning set to 1.9 litres per second optimal (acceptable range 1 to 2.2 ltr/sec)
- Setup differential pressure switch to protect the system. High pressure bottom water pipe and low pressure is the top water pipe.