Assets diversified in technology and geographic location.

3.6

GW in operation

18

assets in operation & construction

assets by technology

Wind619MW

Thermal2.740 MW

Solar200 MW

see all

provinces

295

MW under construction

assets by province

Mendoza

Buenos Aires

activos por tecnología

projects by technology

Chubut

San Juan

Solar205 MW

Córdoba

Santa Cruz

Neuquén

Tucumán

BESS 90 MW

Tucumán Generation Complex

El Bracho, Tucumán

  • 3 combined cycles
  • 1.2 GW installed capacity
  • supplies 1.3 M de homes

Más info

Thermal Generation
Central Dock Sud

Dock Sud, CIudad de Buenos AIres

  • 1 combined cycle
  • 1 BESS proyect
  • 2 gas turbines
  • 933 MW installed capacity
  • Reliable Energy for Buenos Aires area

Thermal Generation

Enerí trmica

Manantiales Behr Power Plant

Comodoro Rivadavia, Chubut

  • 58MW installed capacity
  • Engine generation
  • High efficiency/ Fast start.
  • Hybrid generation, complements wind farm.

Thermal generation
Loma Campana Complex

Añelo, Neuquén

  • 2 thermal power plants
  • 1 distributed energy plant
  • 218 MW installed capacity

Thermal Generation
Los Teros Wind Farm

Azul, Buenos Aires

  • 175MW installed capacity
  • 45 turbines
  • 49% capacity factor
  • Avoids 408,500tn of CO2/year.

Wind generation

El Zonda Solar Park

Iglesia, San Juan

  • 100 MW installed capacity.
  • 170,880 bifacial panels
  • Avoids 110,000 tn de CO2/year

Info

Solar generation

General Levalle Wind Farm

General Levalle, Córdoba

  • 155 MW installed capacity
  • 25 turbines
  • Investment USD 260MM
  • COD Q4 2024

Renewable asset under construction

Cañadón León Wind Farm

Cañadón Seco, Santa Cruz

  • 123 MW installed capacity.
  • 29 turbines.
  • Avoids 312,000 tn of CO2/yr.

Wind generation

El Quemado Solar Park

Las Heras, Mendoza

  • 305 MW installed capacity.
  • 330,000 bifacial panels
  • Investment: USD 170 M
  • COD Q1 2026

Solar asset under construcción

La Plata Cogeneration Complex

Ensenada, Buenos Aires

  • 2 cogeneration plants
  • 218MW installed capacity
  • Supplies steam to YPF Industrial complex and electricity to system.

Thermal Generation
CASA Wind Farm

Olavarría, Buenos Aires

  • 63 MW installed capacity
  • 9 turbines
  • Investment USD80MM
  • COD Q1 2026

Manantiales Behr Wind Farm

Comodoro Rivadavia, Chubut

  • 103 MWinstalled capacity
  • 30 turbines
  • Avoids 260,000 tn of CO2 /yr.
  • Issues Verra CO2 Certificates

Wind generation