Virtual tour

West

41 tanks

Since 2011

Max 50.000 m3 one tank

total capacity 1.216.180 m3

7 vessel places

10 Barge places

Loading

Both

Unloading

Vessel dock

  • Vessels with multiple tanks inside
  • Will be unloaded or loaded with oils

Barge dock

  • Barge are smaller boats for canals
  • Can be loaded or unloaded

Pipe hub

  • All the pipes on the west side come together
  • Connection between tanks and vessels or barge

Water distillation

  • Water that comes from the vessels is being captured
  • Making sure clean water gets back into the sea

Oil tanks

  • Storing different oils
  • Blending different oils to get the right end product
  • The biggest tank is 50.000 m3

Active coal installation

  • Gasses from (un)loading are captured
  • gasses will be made reusable

Next step

Home

Incoming Transport

Step 1

Distillates

  • Transported by vessels
  • Between 10-47 days of travel

EVOS Amsterdam West

America

South America

Africa

Next step

Previous step

Distillates

  • Transported by vessels
  • Between 10-47 days of travel

Distillates

  • Transported by vessels
  • Between 20-65 days of travel

Step 2

Unloading

Vessel:

  • The biggest vessel that can dock
  • Max 120.000 tons
  • 245 meters long
  • Can be filled with:
    • Diesel
    • Benzine
  • Can be unloaded with:
    • Distillates
  • 24 different tanks insight

Vessel arm:

  • Unloading distillates
  • With two arms the vessel gets (un)loaded
  • Max speed of 42.000 liters per minute
  • Speeds can be monitored and controlled in the liters exact
  • Can take up to 4-5 days till fully empty

Gas pipe

  • Takes up the gasses that come free from unloading
  • Gasses will be brought to the active coal installation

Next step

Previous step

Vessel inside

Step 3

Liquid transportation

Next step

Previous step

Oil pipes

  • Distillates from the unloading will be transported through these pipes to the hub
  • One pipe can be used for multiple different oils
  • Pipes can be cleaned out through a special ''plumber''
  • Has to be cleaned every time a different oil goes through

Pipe hub

  • All pipes come together
    • Pipes that come from the docks
    • Pipes that go to the storage tanks
  • Pipes will be connected through switches
    • Each pipe can be sent to another storage tank
  • The place where all of the pumps are

Step 4

Liquid Storage

Next step

Previous step

Dikes

  • Dikes always surrounds a x amount of oil tanks
  • If all the tanks crack -> dike will catch all the oil with an extra margin
  • Depends on the volume of all the tanks combined

Storage tanks

  • Volume
    • Minimum 10.000 m3
    • Maximum 50.000 m3
  • Blender inside to blend different oils
  • Floating roof for gas to escape
  • When there is a change of oil in the tank, the tank first will be fully cleaned

Extinguisher

  • In case of fire, there are everywhere extinguisher poles
    • Corners of the storage tanks
    • Two at every (un)loading dock
  • Contains water with foam
    • Water out of the sea will be pumped
    • Foam will be added to the water
    • Process in a closed room
  • Automatically turned on

A total of 41 storage tanks

Step 5

Gas tranformation

Pumps

Tanks with active coal

Tank with the usable gasses

Next step

Previous step

Transformation of collected gas

  1. Gas that has been collected will be loaded into these white tanks
  2. In those tanks, there is active coal inside
  3. Together with the pressure from the pomps, the gasses get infused
  4. Eventually, the gasses can be reused and stored
  5. This will then be sold again and transported with vessels
  6. after the process half of the tanks needed to be cleaned out

Step 6

Water clearing

Filter

Next step

Previous step

Water filtration

  1. Water that has been collected will be cleaned
  2. Water will go into a big filter
    1. Dirt will eventually flow on top
    2. The machine takes off the upper layer
  3. The cleaned water will go back into the sea

Step 7

Loading

Next step

Previous step

Fuel arm

  • Speed can be controlled in the control room
    • Depends on the angles of pipelines on the boat
  • All kinds of fuel can be loaded with the arm

Butane arm

  • Hydrocarbon can be loaded with this arm

Crain

  • Is used to transport the connection tube
    • Connects fuel arm with the boat -> can be different diameters
  • Also, a fire extinguisher is on top

Gas that comes free is collected by the tube Eventually transported to the active kool installation

Safety

  • Each docking place:
    • One emergency shower
    • 2 Fire extinction poles

Barge

  • 8 different tanks inside
  • Barge are used for inland transportation
  • Can hold a max of 12.000 tons
  • Will be transported to tanks of companies like BP or Shell

Outgoing Transport by vessel

Step 8

EVOS Amsterdam West/East

America

South America

Africa

Benzine/Diesel

Benzine/Diesel

Benzine/Diesel

Next step

Previous step

Oils stored in the tanks of the company

Step 9

Next step

Previous step

Smaller tanks

  • Tanks from the company itself
  • Will be placed more inland
  • Transported first by vessel then by truck
  • The connection between the gas station

Time to tank!