Radeon Networking Solutions

Problems to be addresssed

  • Expenses present in current office have sky rocketed due to many number of routing devices to connect machines to each floor.
  • Maintanance due to high number of machines is extreme.
  • When the network is busy in their offices, its slow because initially they did not use multilayer switches which would increase the workload on routers i.e the inter-vlan routing

Abstract

Brackly Bank plans to open a brank in Kenya. It sets up an 4 floor buliding and plans to take base. its building has four floors each with 3 departments with the company servers to be stationed in the fourth floor. Moreover, they need appropriate protocols to be issued as well as enable scalability incase of need of new employee devices and networking devices.

Problem

Solution

Product-Service

Team

TABLE OF CONTETS.

Why our solution:
  • By using multi-layer switches it increases the performance of the network since the work load of inter-vlan routing is reduced from the router and reduces the number of routing devices.
  • By using Hierachical model we guarantee scalability
  • The network solution is highly redundant ensuring connectivity at all times

PROBLEM STATUS

The company is need of its whole office building to be interconnected into its own local network

Ponfigure the server room devices with static IP daddressing to ensure constant availability.

Four floors each with 3 departments with the company servers stationed in the fourth floor.

.Configure the company devices with appropriate network protocols to enable communication across the whole office

Test Test Test. Network should be stable through evidence of device communication.

PROBLEM

Workload scope.

Enable 220 computers, 2 admin pc's, servers plus 50 printers to be intgrated and scaled up to support expansion of the business as per company goals.

SOLUtion

Network simulation in packet tracer to enable engineers build it to precision.

If This will enable prior testing and orientation before physical installation

TECHNOLOGIES

Network mockup done in Lucid Chart to outline the setup before configuration.

product

Network set-up done in Packet tracer as testing and configuration made possible plus scalability simulations can be achieved

Teams

Individual

timeline

Finalization

Foundation phase

Construction

Documentation of project.

Understand networking devices needed. Outline network in Ms Visio. Read on device configuration

Network configuration in each floor. devices connected to network. Configure devices to network setup

This is the project outline representation

rESULT OUTLINE

TEAM

Magutu Ph

Kenyatta Chacha

SCT211-0030/2021

SCT211-0032/2020

Mutegi Mutugi