Surkhandarya 1,560MW CCGT Power Plant
Uzbekistan
2022 - 2026
E&S-Category: A
Status: Approved
Timeline
None so far
LATEST FIELD VISIT
May 17, 2023
FINAL REVIEW
June 14, 2023
FINANCING APPROVAL
April 27, 2022
TBC
LOAN CLOSURE
CONCEPT REVIEW
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam.
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam.
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam.
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam.
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam.
EUR 1,205 mln
Total Project Costs
EUR 225 mln
AIIB
Remaining costs to be covered by Sponsors’ equity and external debts from financing partners yet to be confirmed.
Safeguard Concerns
- There is no information on how CO2 emissions calculations were derived and what scopes of emission are being considered. No estimated calculations of other emissions, including methane.
- The project site is beside the Uchkizil irrigation reservoir and there are no specific measures listed for avoiding contamination from effluent discharges or accidental leaks on-site.
- Details on community consultations and addressing project concerns raised by local people remain absent from AIIB's documentation.
- The project is expected to only become operational in 2026 and would undermine the AIIB’s own stated pursuit of Paris alignment and joint MDB climate commitments. To meet these goals, large-scale gas-fired generation needs to peak by 2030 and the electricity sector needs to be decarbonized by 2040.