Resilient Norfolk Coastal Storm Risk Management

Melissa Williams

Created on November 14, 2022

Start designing with a free template

Discover more than 1500 professional designs like these:

Transcript

NS

Project Phases

the citywide project is divided into FIVE implementation phases

NS

NS

Back

DOWNTOWN

PHASE

RISK REDUCTION FEATURES:

A system of floodwalls with a levee, surge barriers, and natural and hybrid infrastructure, extending from Ghent through downtown connecting to the Ohio Creek Watershed project.

PUMP STATION

T-WALL

View the Benefits

T-WALL/LEVEE

BINWALL

GATE

NATURAL

Back

DOWNTOWN

PHASE

RISK REDUCTION FEATURES:

A system of floodwalls with a levee, surge barriers, and natural and nature-based features, extending from Ghent through downtown connecting to the Ohio Creek Watershed project.

PUMP STATION

T-WALL

View the Benefits

T-WALL/LEVEE

BINWALL

GATE

NATURAL

Back

PRETTY LAKE

PHASE

A system of floodwalls and storm surge barriers to reduce storm surge from entering Pretty Lake at Shore Drive.

RISK REDUCTION FEATURES:

PUMP STATION

View the Benefits

T-WALL

GATE

NATURAL

Back

LAFAYETTE

PHASE

RISK REDUCTION FEATURES:

A storm surge barrier from Norfolk International Terminal (NIT) to the Lamberts Point golf course to reduce storm surge risk to the Lafayette River watershed.

PUMP STATION

T-WALL

View the Benefits

GATE

NATURAL

LEVEE

Back

BROAD CREEK

PHASE

A system of floodwalls, storm surge barrier and tide gates to reduce storm surge entering Broad Creek at I-264.

RISK REDUCTION FEATURES:

NATURAL

PUMP STATION

GATE

View the Benefits

Back

NON STRUCTURAL

NS

PHASE

A series of property-specific flood mitigation projects: home elevations, basement fills, acquisitions, floodproofing, etc. Work takes place in multiple areas of the city including Berkley, Campostella, Elizabeth Park, Ingleside, Norfolk International Terminals (NIT), and Willoughby.

RISK REDUCTION FEATURES:

PROPERTY

Back

NON STRUCTURAL

NS

PHASE

A series of property-specific flood mitigation projects: home elevations, basement fills, acquisitions, floodproofing, etc. Work takes place in multiple areas of the city including Berkley, Campostella, Elizabeth Park, Ingleside, Norfolk International Terminals (NIT), and Willoughby.

RISK REDUCTION FEATURES:

NATURAL

PROPERTY

Back

NON STRUCTURAL

NS

PHASE

A series of property-specific flood mitigation projects: home elevations, basement fills, acquisitions, floodproofing, etc. Work takes place in multiple areas of the city including Berkley, Campostella, Elizabeth Park, Ingleside, Norfolk International Terminals (NIT), and Willoughby.

RISK REDUCTION FEATURES:

NATURAL

PROPERTY

Back

NON STRUCTURAL

NS

PHASE

A series of property-specific flood mitigation projects: home elevations, basement fills, acquisitions, floodproofing, etc. Work takes place in multiple areas of the city including Berkley, Campostella, Elizabeth Park, Ingleside, Norfolk International Terminals (NIT), and Willoughby.

RISK REDUCTION FEATURES:

PROPERTY

Back

NON STRUCTURAL

NS

PHASE

A series of property-specific flood mitigation projects: home elevations, basement fills, acquisitions, floodproofing, etc. Work takes place in multiple areas of the city including Berkley, Campostella, Elizabeth Park, Ingleside, Norfolk International Terminals (NIT), and Willoughby.

RISK REDUCTION FEATURES:

NATURAL

PROPERTY

Back

NON STRUCTURAL

NS

PHASE

A series of property-specific flood mitigation projects: home elevations, basement fills, acquisitions, floodproofing, etc. Work takes place in multiple areas of the city including Berkley, Campostella, Elizabeth Park, Ingleside, Norfolk International Terminals (NIT), and Willoughby.

RISK REDUCTION FEATURES:

NATURAL

PROPERTY

NS

NS

NS

NS

NS

NS

NS

Project Phases

the citywide project is divided into FIVE implementation phases

NS

NS

NS

NS

NS

NS