MOT PRESENTATION

Amr Eid

Created on October 19, 2022

Start designing with a free template

Discover more than 1500 professional designs like these:

Geniaflix Presentation

Vintage Mosaic Presentation

Shadow Presentation

Newspaper Presentation

Zen Presentation

Audio tutorial

Pechakucha Presentation

Transcript

MOT CONTRACT

EXPENSESE REDUCTION EXCERSIZE

start

index

01 · Project income analysis

02 · Solutions

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Mauris bibendum ligula ipsum, quis aliquet ipsum imperdiet vel.

PROJECT INCOME ANALYSIS

ADDITIONAL FEES*

TOTAL INCOME

INCOME BY MONTH

CONTRACT FEES

2,967,000 +296,700 --------------- 3,263,700

3,263,700 / 24 = 135,987 SR/M

2,967,000 SR PROJECT DURATION 24 MONTH

AS PROMISED BY OWNER 10% V.O. WORTH 296,700

*estimated based on owener discussion to issue a V.O. at the end of the project.

solutions

SOLUTIONS CAN BE DIVIDED TO THESE CATEGORIES

EASY/IMMEDIATE

MODERATE*

long term

GRAPHIC DESIGNERS

MEP ENGINEERS

obtain additional wrok

MEP engineers (2) can work with ECEC with partial duty in MOT (2-3) days /week

reduce the number of the graphic designers and/or assign to them ECEC work

  • try to convert some of the up coming consulltaion work to additional paied contracts, eg.
  • water network studies.
  • strucural consultations.
  • saftey and fire solutions.

*owner approval must be obtained with consideration the relation with the graphic designers.

Thank you

Amr Eid Architect MOT project manager