PROJECT INCOME ANALYSIS
ADDITIONAL FEES*
TOTAL INCOME
INCOME BY MONTH
CONTRACT FEES
2,967,000 +296,700 --------------- 3,263,700
3,263,700 / 24 = 135,987 SR/M
2,967,000 SR PROJECT DURATION 24 MONTH
AS PROMISED BY OWNER 10% V.O. WORTH 296,700
*estimated based on owener discussion to issue a V.O. at the end of the project.
solutions
SOLUTIONS CAN BE DIVIDED TO THESE CATEGORIES
EASY/IMMEDIATE
MODERATE*
long term
GRAPHIC DESIGNERS
MEP ENGINEERS
obtain additional wrok
MEP engineers (2) can work with ECEC with partial duty in MOT (2-3) days /week
reduce the number of the graphic designers and/or assign to them ECEC work
- try to convert some of the up coming consulltaion work to additional paied contracts, eg.
- water network studies.
- strucural consultations.
- saftey and fire solutions.
*owner approval must be obtained with consideration the relation with the graphic designers.
Thank you
Amr Eid Architect MOT project manager
595225528
mot.pm@ecec.com.sa
MOT PRESENTATION
Amr Eid
Created on October 19, 2022
Start designing with a free template
Discover more than 1500 professional designs like these:
View
Geniaflix Presentation
View
Vintage Mosaic Presentation
View
Shadow Presentation
View
Newspaper Presentation
View
Zen Presentation
View
Audio tutorial
View
Pechakucha Presentation
Explore all templates
Transcript
MOT CONTRACT
EXPENSESE REDUCTION EXCERSIZE
start
index
01 · Project income analysis
02 · Solutions
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Mauris bibendum ligula ipsum, quis aliquet ipsum imperdiet vel.
PROJECT INCOME ANALYSIS
ADDITIONAL FEES*
TOTAL INCOME
INCOME BY MONTH
CONTRACT FEES
2,967,000 +296,700 --------------- 3,263,700
3,263,700 / 24 = 135,987 SR/M
2,967,000 SR PROJECT DURATION 24 MONTH
AS PROMISED BY OWNER 10% V.O. WORTH 296,700
*estimated based on owener discussion to issue a V.O. at the end of the project.
solutions
SOLUTIONS CAN BE DIVIDED TO THESE CATEGORIES
EASY/IMMEDIATE
MODERATE*
long term
GRAPHIC DESIGNERS
MEP ENGINEERS
obtain additional wrok
MEP engineers (2) can work with ECEC with partial duty in MOT (2-3) days /week
reduce the number of the graphic designers and/or assign to them ECEC work
*owner approval must be obtained with consideration the relation with the graphic designers.
Thank you
Amr Eid Architect MOT project manager
595225528
mot.pm@ecec.com.sa