Want to create interactive content? It’s easy in Genially!
FACTORY ESCAPE GAME
Junior Fofana
Created on April 15, 2022
Start designing with a free template
Discover more than 1500 professional designs like these:
View
Secret Code
View
Corporate Escape Room: Operation Christmas
View
Reboot Protocol
View
Desert Island Escape
View
Halloween escape
View
Horror Escape Room
View
Witchcraft Escape Room
Transcript
BUILDING ESCAPE GAME
start
answer the questions in order to access the room of success
THE MISSION
This building contains 5 rooms. In each room, you will be asked 3 questions. You must therefore have 15 correct answers to access the room of success. If you make 2 mistakes in the same room, you will be locked in there for 2 days. Please note that the time allowed for each piece is 10 minutes and you are only allowed 5 errors in total.
STEP 1 : Concrete in structures
Find the clue you need to keep moving forward
QUESTION 1/3
Right answer
Concrete is a material that has good compressive strength. The reinforcements therefore help it to overcome this defect so that it can resist both traction and compression.
Wrong answer
QUESTION 2/3
Right answer
concrete is by far the best economical choice for sustainable construction because its ability to store heat or coolness makes homes comfortable in summer and winter alike, and this generates energy savings!
Wrong answer
QUESTION 3/3
Wrong answer
Reinforced concrete is the most widely used material in the construction of buildings. Composed of concrete and reinforcing bars, its density is 5,4 g/cm³
Right answer
STEP 2 : Construction site management
Find the clue you need to keep moving forward
QUESTION 1/3
He has the highest position on the construction site
Must have an engineering degree
The role of the site foreman is to coordinate and direct the work on the site.
He is not responsible for the quality of the work
QUESTION 2/3
is responsible for coordinating stakeholders
defines the work specifications
In carrying out a project, the client is the one who:
directs the construction site of the structure
QUESTION 3/3
planning, control, improvement
A quality policy always has three components:
technical, commercial, administrative
design, manufacture, maintenance
STEP 3 : Construction risks
Find the clue you need to keep moving forward
QUESTION 1/3
I favor collective protection
I favor personal protection
You work on a scaffolding floor at a height of 3m
None because I do not work more than 3m high
QUESTION 2/3
You can use a ladder
You can use a stepladder
You are going to repaint a facade 4m high by 8m long
You can use a rolling scaffold
QUESTION 3/3
Workers are working on it
The scaffolding is being modified
Access to the scaffolding is prohibited when:
There is fog
STEP 4 : The elements of the building
Find the clue you need to keep moving forward
QUESTION 1/3
Limit heat loss to the ground
Acoustically isolate the building from outside noise
Foundations are used to
Protect the construction from climatic aggressions
Transmit all loads from the construction to the supporting soil
QUESTION 2/3
Structural work
Rehabilitation
The construction of the frame of a house is called
Finishing works
structure dimensioning
QUESTION 3/3
Can be made of reinforced concrete
to support the cover and contribute to the air and water protection of the house
The function of the frame of a house is
Is implemented for its aesthetic effect
Is very often made of steel
STEP 5 : You won
Mission Complete
YOU HAVE REACHED THE HALL OF SUCCESS. MANY TREASURES AWAIT YOU THERE.
START OVER?
MISSION FAILED
You've destroyed the base......
try again