CAHV Commissioning Wiring & Dipswitches
CAHV Commissioning Wiring & Dipswitches
Commissioning:
- Check "Setup guide" to suit your application (downloadable)
- System will need to be powered up and waterside finished
- Wire in the pump interlock and other wiring required for communication and running of the equipment. "Controls guide " downloadable
- Initialise the system
- Setup dipswitches to suit application
CAHV Commissioning Wiring & dipswitches