CAHV Commissioning waterside
CAHV Commissioning waterside
Commissioning:
- Waterpipe should be clean and watertight
- Ensure all valve are open
- Switch on water pumps
- Set up pump and commissioning set to 2.1 litres per second (1.7 to 2.6 ltr/sec)
- Setup differential pressure switch to protect the system
CAHV Commissioning waterside
lance.hitchins
Created on February 24, 2022