Want to create interactive content? It’s easy in Genially!

Get started free

HVRF Test run

DEP | MITSUBISHI ELECTRIC EUROPE | UK

Created on July 26, 2021

Start designing with a free template

Discover more than 1500 professional designs like these:

Word Search

Sorting Cards

Word Search: Corporate Culture

Corporate Escape Room: Operation Christmas

Happy Holidays Mobile Card

Christmas Magic: Discover Your Character!

Christmas Spirit Test

Transcript

HVRF Testing

HVRF Testing

Checking correct setting of branch ports. To ensure that each indoor unit has the correct branch port setting, approximately half the indoor units attached to each master HBC should be set to test cooling and the other half to test heating. Then change one unit’s mode in the opposite mode previously and note if the correct unit changes in temperature. If, however, another units temperature does change and its mode hasn’t then it is likely that the branch port setting (SW14) is incorrect. It is recommended to test all branch ports before making any changes to the SW14 branch port setting in the indoor unit.

HVRF Testing