Want to create interactive content? It’s easy in Genially!
Test Run Operation
lance.hitchins
Created on March 15, 2021
Start designing with a free template
Discover more than 1500 professional designs like these:
Transcript
Test Run Operation
Test run operation ignores the controller target temperatures and instead set a fixed 0 degrees celsius evaporating temperature in cooling or 53 degree celsius condensing temperature in heating to allow constant level of heating or cooling performance. When operating in test mode the full system should be in either heating or cooling - not mixed mode.
Next
Test run is ideal to monitor the system performance for:
- Fault finding
- Commissioning
- Maintenance
Test Run Operation
Once test run operation has been activated, the system will operate constantly for 2 Hours unless the system goes into fault If the system recognises an issue it will stop operation for 3 minutes, then start again to monitor the systems performance data again The system can repeat this process upto 16 times before it displays a fault code Once the fault code has been generated the system will shut down fully if the fault is critical
Back
Next
Test Run Operation
Test Run will Automatically stop after 2 hours has elapsed
YOU DO NOT HAVE TO DO ANYTHING!
Back
The system will return to the same mode and target temperature it was set to previous to test run operation