Want to create interactive content? It’s easy in Genially!

Get started free

Outdoor Unit Piping

DEP | MITSUBISHI ELECTRIC EUROPE | UK

Created on November 12, 2020

Start designing with a free template

Discover more than 1500 professional designs like these:

Modern Presentation

Terrazzo Presentation

Colorful Presentation

Modular Structure Presentation

Chromatic Presentation

City Presentation

News Presentation

Transcript

Outdoor Unit Piping

500mm of straight pipe required between each twinning kit or before the first bend

Outdoor Unit Piping

Outdoor Unit Piping

Outdoor Unit Piping

Maximum Height difference of 100mm between the Highest and Lowest Outdoor unit (H)

The Pipe work must flow downwards from the first outdoor unit into the building. Oil will get trapped at point A if the pipe work is inclined into the building

Downwards slope